Symbior Energy inaugurates its two Solar Power Plants of a total of 10 MWp in Samut Sahkon province. Both plants will produce approximately 14,500 MWh of clean energy per year. The plant is designed with CdTe Thin-film technology modules from First Solar and SMA outdoor inverters.
The inauguration with the ribbon cutting took place on the 1st of March 2016. Symbior Energy invited for a site visit and company presentation. The event was rounded up with food and drinks and a Chinese New Year performance with a Dragon dance and spectacular acrobatic shows.